Willkommen zu  www.interim-xl.de Powered by Bouwe van der Meer Interimsmanager und Berater 25 Jahre Erfahrung in 10 Sektoren und 20 Projekte World Wide Einsetzbar High Level Einkauf Senior Supply Chain Manager Schwertransport und Projektcargo Grüne und Haltbare Transportlösungen Intermodal Fracht Lösungen Flottenmanagement Workshops und Gastredner Finanz Restrukturierung Manufacturing and Operations Business Development und Marketing Warehousing und IT-Projekte

Other Blogs

Tendering Lessons Learnt 5
Tendering Lessons Learnt 4
Tendering Lessons Learnt 3
Tendering Lessons Learnt 2
Tendering Lessons Learnt 1
Procurement is complicated
Procurement is profession
Tendering killing your business!
Interim managers innovate!
Live and work free
8 stepts for recovery
Purchaser is seller
Sales connect to logistics
Logistic buyers get connected




Tendering Transport - Lessons Learnt 1

Large investment in equipment with only deployment for the main customer

A traditional tender was issued for transport mainly from storage locations to factories back and forth. Required were approx. 20 trucks dedicated with 60 m3 bulk trailers.

It was local transport with high usage (365 days at 24h). A number of trailers had to be adapted with special generators to keep the load during the transport liquid and were only deployed during fall and winter.

Since it was local transport, only three carriers in this particular area were interested and had the capacity; the current carrier and two other local carriers.

Events developed as follows:
• Number three was afraid to be dumped after the contract period and then to get left with the fleet. He declined after he found out the details of the project.
• Number two was already working for the main carrier (subcontractor) and was afraid when he lost the tender process; he would have upset the main carrier (his client after all). Number two also declined.
• Number one, the current carrier, used his renewed strong position and confronted the customer with his new and unfavorable position.

He offered them a new 5 year contract with absurd high prices and was threating to stop the transport service. This would immediately stop 5 factories with 700 people working. The carrier could do that unpunished while the official contract period was over.

In the end, the client managed to convince number two (the current subcontractor) to quote for the transport although he would get into a dispute with the current main carrier.

In the end the main carrier lost the tender process and the subcontractor won the contract.

It was a close call, things got very messy and parties ended up settling things in court.

Lesson Learnt:

If you depend on the local market, start with local research before launching a tender. Don’t assume everyone will fall for new business.

Interim XL

Powered by
Bouwe van der Meer
KVK Leeuwarden: 011.177.76
VAT number: 109454376B03

Sekretariat

De line 16 8411 TV JUBBEGA
The Netherlands
Phone: +31 6 46 84 23 31
info@interim-xl.de

Andere Websites

Interim-xl.de
Interim-xl.com
Spedition-logistik-beratung.de
Vandermeer-advies.nl

Weitere Links

Testitimonials
Gastredner
Ghost Negotiator
Shadow Negotiator